How do you specify a ramp-up schedule with eValid?

Use and application of the eValid server loading (LoadTest) capability. And in the cloud computing context for monitoring and loading.

How do you specify a ramp-up schedule with eValid?

Postby usadd » Wed Feb 09, 2011 4:29 pm

How do you specify a ramp-up schedule with eValid?
usadd
 
Posts: 1
Joined: Wed Feb 09, 2011 4:28 pm

Re: How do you specify a ramp-up schedule with eValid?

Postby eValid » Fri Feb 11, 2011 10:32 am

usadd wrote:How do you specify a ramp-up schedule with eValid?

In eValid LoadTest mode, the individual eValid instances -- called Browser Users (BUs) -- are launched from a special eValid script called a LoadTest script.

All eValid commands are available in this script -- plus the additiona _eValid command that launches a separate BU instance.

The ramping schedule is set in the LoadTest script using Wait or Delay commands to stagger the launches of the BUs.

This flexibility lets you establish virtually ANY ramp-up and ramp-down schedule you want.

You control how long a BU runs by specifying how many times you want the script it is assigned to repeat, and/or by setting the maximum timeout for that BU.

eValid LoadTest Support
eValid
 
Posts: 2431
Joined: Tue Jan 01, 2008 12:48 pm
Location: USA


Return to Performance/Load Testing